Renovation of the ENEDIS 225/20 kV substation in Lyon Vaise by SOTEB

Renovation de trois transformateurs

Modernization of a Strategic Facility for Lyon’s Power Supply

The 225/20 kV Lyon Vaise high-voltage substation, located in the La Roquette neighborhood (Lyon’s 9th arrondissement), is a key facility for supplying electricity to the northwestern part of the Lyon metropolitan area.

Managed jointly by RTE and ENEDIS, this substation plays a vital role in ensuring the safety and continuity of the grid’s power supply.

In this context, ENEDIS has launched a comprehensive program to upgrade its equipment in order to modernize its infrastructure, improve the reliability of its facilities, and keep pace with changing energy consumption patterns in the region.

Modernisation dune installation strategique pour lalimentation electrique de lyon
Renovation du poste source ht 225 20 kv

Objectives of the 225/20 kV high-voltage source substation renovation project

  • Modernize a strategic source station at an operational site,
  • Enhance the reliability and operational safety of the local power grid,
  • Adapt the facilities to current operating and maintenance requirements,
  • Ensure uninterrupted power supply throughout the construction work.

Organization and Management of the Power Source Station Renovation Project

A Temporary Joint Venture (GME) was formed for this project on behalf of ENEDIS: the work is being managed by SOTEB, acting as the joint venture’s lead contractor, in a joint venture with EGCS, which is responsible for the civil engineering work.

Work began in January 2023, and the project is scheduled to be completed in 2028. This project will therefore span several years and requires rigorous coordination of activities and personnel, within a constrained environment that remains in continuous operation.

Organisation et pilotage du chantier de renovation poste source

Electrical renovations carried out by SOTEB

SOTEB’s teams operate across a broad technical scope, covering control and command systems, transformers, high-voltage installations, and interconnections, with high standards for safety and service continuity.

Renovation complete du controle commande

Control and Auxiliary Services

SOTEB is carrying out a complete overhaul of the control and command system, including, in particular:

  • The design and outfitting of a new control room,
  • Installation and connection of the control and command systems,
  • Installing cable trays and running low-voltage cables,
  • Replacing electrical panels,
  • Complete removal of the old control and signaling system (cables and equipment).

This work will modernize the substation’s control architecture and improve operational reliability.

Refurbishment of three 225/20 kV – 80 MVA transformers

The replacement of three 225/20 kV transformers is one of the project’s key components.

SOTEB’s teams provide the following services, among others:

  • The replacement of low-voltage connections and junction boxes,
  • The comprehensive renovation of the transformer station (closely linked to civil engineering work, including insulation, ventilation, and structural work) and the replacement of its lighting and grounding system,
  • The replacement of power supplies for the transformer fire protection system,
  • The wiring work for the TR auxiliary cabinet and the air extraction boxes,
  • The high-voltage renovation of the secondary winding of the transformer, …
  • Monitoring of the common tank and the agitation tanks.
Renovation de trois transformateurs
Renovation des equipements hta

Renovation of High-Voltage Equipment

SOTEB also performs work on the substation’s high-voltage systems, including:

  • The replacement of neutral point coils, as well as the replacement and removal of high-voltage switchgear,
  • The replacement of HV/LV auxiliary transformers (250 kVA),
  • The installation of auxiliary panels and temporary equipment,
  • The layout of the HTA rooms,
  • Renovation of the control and command system and the interfaces with the high-voltage switchgear.
  • Renovation of high-voltage power lines, including the installation of new 630 mm² 20 kV lines, the removal and replacement of existing cables, and the installation of temporary connections during critical phases to maintain power supply throughout the project.

A high-value-added renovation of a power substation

This project demonstrates SOTEB’s ability to:

  • Manage complex, multi-year electrical projects,
  • Perform work on high-voltage (HV), medium-voltage (MV), and low-voltage (LV) systems at operational sites,
  • Coordinate projects involving a consortium of companies,
  • Ensure safety, operational continuity, and quality of execution on strategic projects.

The renovation of this ENEDIS substation in Lyon Vaise directly contributes to ensuring a reliable power supply for the Lyon metropolitan area and to adapting the grid to future challenges.

Through this project, SOTEB reaffirms its role as a leading player in the modernization of electrical distribution infrastructure and its commitment to working alongside the Gérard Perrier Industrie Group on transformative and sustainable projects.